Commercial Construction
|
Construction of Metal Warehouse
|
| Owner: |
Jasper Industrial Development Board |
| |
| Architect: |
Design Build Project |
| |
 |
Construction of a 53,080 sf pre-engineered metal building, and establishment of a 50,000 sf building pad for future expansion. Project includes a 3,000 sf wrap around administrative office area at the northeast building corner location, asphalt paved roadways and parking, loading dock with roll-up doors, and site improvements consisting of storm drains and sanitary sewer. The pre-engineered metal building system has a metal seam roof system, and metal wall panels with a translucent light panel. Aluminum frame storefronts identify office areas, with 12’ x 14’ overhead door systems utilized at the warehouse area. Ventilation fans and louvers are provided to address HVAC needs at the warehouse
|